The Garden State Parkway, 1950 to 1957
How a toll-free bypass plan became the Garden State Parkway: the 1950 first section, the 1952 Highway Authority, tolls in 1954 and the New York extension.
The Garden State Parkway was supposed to be free. When planners first drew it, in the 1940s, it was a bypass of a congested state route, a parkway in the old sense of a landscaped road for passenger cars, to be built with public money and opened without tolls. That plan lasted about four years. The road that eventually reached from the Cape May peninsula to the New York line was a toll road financed with bonds, run by its own authority, and built in a rush between 1950 and 1957.
This is how it happened, in the order it happened.
The idea: linked parkways, then a bypass
The first plans were broader. As early as 1941, planners proposed a set of connected parkways across eastern New Jersey. By 1946 the focus had narrowed to a high-speed bypass of Route 4, a congested road through Bergen County, and the project was called the Route 4 Parkway. It was planned as a free road.
The reasons for it were visible to anybody who drove. The state's main north-south highways ran through the centers of towns, and as the postwar car boom began, they were clogged with local traffic, trucks and shore-bound weekenders. A parkway would let through traffic skip the traffic lights. The same pressure was producing the Turnpike, planned in the same years; see The Turnpike opens, 1951 to 1956.
June 29, 1950: the first piece
The first section opened on June 29, 1950. It ran from Route 27 north to Cranford, a short segment that served as proof of concept. It was, like the original plan, toll-free.
Then the money ran out. Building a limited-access road is expensive, and the state's appropriations did not cover the whole route. The project stalled, with a short road that went from nowhere in particular to somewhere nearby.
April 1952: the Highway Authority
The solution was the same as for the Turnpike. In April 1952 the state created the New Jersey Highway Authority and charged it with finishing the road as a toll road. The authority could issue revenue bonds and repay them from tolls, which meant the road would pay for itself instead of drawing on tax revenue. The Parkway became a self-liquidating toll road. The Turnpike Authority runs both roads today; New Jersey Turnpike Authority and South Jersey Transportation Authority describes the agency.
The decision changed the Parkway's character. A free parkway had been a local bypass. A toll road financed by bonds had to attract enough traffic to repay them.
1953 and 1954: the road grows
Construction picked up speed under the Authority. On July 16, 1953 the road reached Union Township. Sections north of Irvington followed in the next months. The first tolled segment opened on January 13, 1954, between U.S. 22 and Mill Road, and tolls had begun.
Through 1954 the pace was brisk. The Parkway's southern sections, including the long run through the Jersey Shore counties to the end of the Cape May peninsula, were finished that year, and on October 9, 1954, the entire highway south of Irvington was declared complete. The road gave the shore counties a direct north-south route; see Toms River, Atlantic City and Cape May.
1956 and 1957: the north and New York
The northern end was finished last. The main road was complete in 1956, and the extension to New York followed in 1957. The Parkway runs north to the state line at Montvale, where it becomes a connector into New York's highway system.
By the end of the project the road ran about 172.4 miles, from Exit 0 at Route 109 in Lower Township, Cape May County, to Montvale. For the whole route, see The Garden State Parkway from Cape May to Montvale, and for the southern end, Cape May: the end of the Parkway.
A name taken from a nickname
The road's working name had been the Route 4 Parkway. When the project was reorganized, it was renamed the Garden State Parkway, after the state's nickname. The landscape architect Gilmore David Clarke led the project's design. The name fit the road's purpose, a road for pleasure trips and commuters alike, and it fit the state's self-image, a place with farms as well as factories.
The road's design reflected the parkway tradition. It was a divided highway with landscaped medians, designed for the comfort of passenger travel, and over time it has become as much a commuter road as a shore road.
Counting the years and the miles
The calendar reads quickly. From the first section on June 29, 1950 to the first toll on January 13, 1954 is about three and a half years. From the first section to the declaration that everything south of Irvington was done, on October 9, 1954, is a little over four years. The road reached its full length about seven years after the first piece opened.
The mileage is simple because the exit numbers double as mileposts. Exit 0 is at Route 109 in Lower Township. Exit 163 is at Paramus, where the Parkway meets Route 17. The road is about 172.4 miles in all, so the last stretch from exit 163 to the New York line at Montvale is about nine miles. A driver can tell from an exit number how far it is to Cape May, which is not true of the Turnpike, whose exits are numbered in order.
The two roads side by side
| Garden State Parkway | New Jersey Turnpike | |
|---|---|---|
| Length | About 172.4 miles | 117.2 miles mainline; 148.18 miles with extensions |
| First section opened | June 29, 1950 | November 5, 1951 |
| First toll | January 13, 1954 | From the first opening |
| Operating authority at the start | New Jersey Highway Authority (1952) | New Jersey Turnpike Authority (1948) |
| Ends | Cape May County and Montvale at the New York line | Delaware Memorial Bridge and the George Washington Bridge |
| Route number | Unsigned Route 444 | Interstate 95 and, on an extension, Interstate 78 |
| Exit numbers | Mileposts, from 0 | Numbered in order, 1 to 18 |
The two serve different drivers, and the differences explain a good deal about how each road looks. The Turnpike was built as a freight-and-through-traffic artery between the Delaware and the Hudson, and it connects at either end to the national interstate network. The Parkway was conceived as a bypass and a passenger road, and it follows the state's eastern side from the shore counties to the New York line, past the commuter towns of Bergen County.
What the road did to a map
A highway that runs the length of a state's shore does not only carry traffic. It also redraws where people can live and work, and the Parkway made a number of places reachable from the north that had been far away. The shore towns of Monmouth, Ocean and Atlantic counties had rail lines, but a road allowed families to drive to the beach, buy a house for the summer or move there year-round and commute. Those patterns are part of the shore's modern economy, described in The Jersey Shore summer calendar, and they begin with the pavement laid in the early 1950s. For the road as a ride, the longer treatment is The Garden State Parkway from Cape May to Montvale.
The Parkway today
The details a driver notices now come from the first decade.
- Exit numbers are mileposts. Exit 0 is at the southern end in Cape May County, and the numbers rise northward. Exit 163 is Paramus, where the Parkway meets Route 17; see Paramus: where Route 17 meets the Parkway.
- The road has an unsigned route number. It is Route 444, which does not appear on the road's signs.
- The speed limit is 65 mph on most of the length.
- Tolls. Parkway and Turnpike tolls were raised 3 percent on January 1, 2026, and tolls rise 3 percent a year under a 2020 plan; see Why New Jersey tolls rise 3% a year and How E-ZPass and tolls work in New Jersey. The Authority's toll calculator gives the current rates.
- Service areas. The road's rest stops carry names of notable New Jerseyans, as the Turnpike's do. The Authority has renamed several of them, and its service-area pages have the list.
For a driver's guide to the road and its sister road, see Driving the Turnpike and the Garden State Parkway.
Why it was built so fast
The pace of the road's construction, about seven years from the first section to New York, stands out. A few things help explain it.
- Demand. Postwar car ownership and shore travel made the case obvious to voters and legislators.
- Financing. Toll bonds allowed the Authority to borrow against future revenue.
- Competition and example. The Turnpike, started at the same time, showed that a bond-financed toll road could be built quickly in New Jersey.
- A single authority. Once the state gave the work to an agency with one job, the stalled project moved.
The timeline
- 1941. Planners propose connected parkways across eastern New Jersey.
- 1946. The plan narrows to the Route 4 Parkway, a toll-free bypass.
- June 29, 1950. The first section opens, from Route 27 to Cranford.
- April 1952. The New Jersey Highway Authority is created to finish the road as a toll road.
- July 16, 1953. The road reaches Union Township.
- January 13, 1954. The first tolled segment opens.
- October 9, 1954. The whole road south of Irvington is declared finished.
- 1956 to 1957. The main road is completed and the New York extension follows.